Christchurch NZ
Work completed: The ICE 55NF was used to drive 18 no. bridge foundation piles, being 15m long and 1,200mm OD each, required for the erection of a new multi-lane traffic bridge to replace the existing 100 year old bridge. The piles were driven into a river bed consisting of gravels and sands overlaying stiff clays.